Sicher 3D produces as-built drawings in Dubai from fresh measurements, not old CAD files. We survey plots with robotic total stations and scan buildings with handheld LiDAR, then deliver plans, sections, elevations and Revit models that show what was actually built.

✓Plot as-built: footprint, setbacks, heights and levels
✓Building as-built: floor plans, sections and elevations
✓Structural and visible MEP captured by laser scan
✓Deviation report against your approved drawings
✓DWG, PDF, Revit and point-cloud deliverables
2mm
Total station distance + 2 ppm
<1cm
LiDAR relative accuracy
200k
LiDAR points per second
15+
Years in the UAE

What are as-built drawings, and why measure them?

As-built drawings record a building or plot exactly as it was constructed — every wall, column, opening and level in its real position, including the changes made on site. An as-built survey is the measurement work that produces them.

No project is built exactly to the approved drawings. Columns move a few centimetres, openings change, services get rerouted. An as-built drawing that is not based on a survey simply repeats the design and hides those changes until they cause a problem in a renovation, a fit-out or an authority inspection.

This page explains the two types of as-built survey, what we capture, how we check built against approved, and the files you receive.

Plot as-built or building as-built? Often both.

The words “as-built survey” are used for two very different jobs in Dubai. Knowing which one you need saves a second site visit.

Type 1 · Outside the building

Plot / Site As-Built Survey

Proves the building sits where — and how high — it was approved.

  • ✓Building footprint and corner coordinates
  • ✓Setbacks from every plot boundary
  • ✓Building height, roof and parapet levels
  • ✓Finished floor, plinth and external levels
  • ✓Boundary walls, gates, access and external works
  • ✓Visible drainage and service covers
MethodRobotic total station + RTK GNSS on the DLTM grid
Used byConsultants preparing completion submissions · contractors at handover
Type 2 · Inside the building

Building As-Built Survey

Records what is actually inside the walls — not what the drawings say should be there.

  • ✓Floor plans with room dimensions and areas
  • ✓Sections and elevations
  • ✓Structural grid, columns, beams and slabs
  • ✓Visible MEP: ducts, pipes, cable trays, risers
  • ✓Ceiling heights and soffit levels
  • ✓Facades, openings and finishes
MethodHandheld SLAM LiDAR + total station control
Used byRenovation and fit-out designers · facility managers · owners and buyers

Every element that was built, measured where it stands.

From structure to services to finishes, our as-built surveys record what designers and facility managers actually need — not just the outline of the walls.

Sicher 3D Advantage

Measured on site — never traced from old CAD files.

Many as-built drawings in Dubai are simply the last design revision with the word “AS-BUILT” added to the title block. Ours start from a fresh survey. We scan the building with handheld LiDAR and fix control with a total station, so every wall, column and opening on the drawing is a measured position. The same point cloud can later become a Revit model without going back to site.

LiDAR scanTotal station controlCAD + RevitDeviation report
Architecture

Walls, Doors & Openings

Wall positions and thicknesses, door and window openings, stairs, shafts and every room as built.

Structure

Grid, Columns & Slabs

Structural grid, column and core-wall positions, beam soffits and slab edges — checked against the design grid.

MEP

Visible MEP Services

Ducts, pipes, cable trays, risers and plant-room equipment that can be seen and scanned on site.

Levels

Ceilings, Soffits & FFL

Finished floor levels, ceiling heights, bulkheads and soffit levels for fit-out and coordination.

Envelope

Facades & Elevations

Elevations with openings, cladding zones and heights, captured from ground level without scaffolding.

Areas

Measured Room & Floor Areas

Measured areas for design, leasing plans and FM. Title-deed area surveys are a separate DLD-regulated service.

Outside

Site & External Works

Hardscape, ramps, boundary walls, gates, landscaping and external levels around the building.

The deviation report: see exactly what changed.

We overlay the measured as-built on your approved drawings and flag every difference larger than the tolerance you set. You get marked-up drawings and a schedule of deviations — clear evidence for completion, handover, claims or redesign.

  • 01Column positions against the structural grid
  • 02Wall alignments and room dimensions
  • 03Setbacks against the approved site plan
  • 04Opening sizes and positions
  • 05Finished floor and ceiling levels
  • 06Building height and roof levels
PLOT BOUNDARYABCD123C3 +38 mm ✕WALL E+22 mm ✕D-04 1.46 m (1.50) ✕3.006 m ✓appr. 3.000FFL +13.206 ✓design +13.200TOLERANCE ±10 mm
Approved designMeasured as-builtOutside toleranceWithin tolerance ✓
Illustrative example — not a real survey

When do you need as-built drawings?

As-built drawings are needed at the end of a project — and again every time someone has to change the building.

WhenWhy an as-built mattersTypical scope
Completion certificateCompletion submissions to DM, DDA or Trakhees normally include as-built drawings of the final constructionPlot as-built plus building drawings in the authority's format
HandoverThe owner and FM team need a reliable record of what was actually builtFull as-built set, optionally with a Revit model
Renovation or extensionOld drawings are rarely accurate; design from measured dimensions insteadBuilding as-built from a 3D laser scan
Interior fit-outShell-and-core conditions decide what the interior design can doFloor plans, reflected ceiling levels and visible MEP
Buying or leasingCheck the real layout and dimensions before you commitMeasured floor plans
Dispute or claimMeasured evidence of built versus approvedDeviation report with marked-up drawings
Facility managementMaintenance and space planning need current, accurate dataScan-to-BIM model and point cloud

In DDA areas, completion also requires a Third Party Building Survey by a surveyor registered with Dubai Land Department (villas excepted). We tell you at the scoping stage if your project falls under it.

Not sure which as-built you need?Send your approved drawings and what the as-built is for — we will recommend the scope.

WhatsApp your drawings →

Total station for control. LiDAR for everything else.

Critical points such as setbacks, corners and column positions are measured with a total station. Interiors, services and facades are captured with handheld LiDAR and tied to that control. Figures are published manufacturer specifications; achieved accuracy also depends on control and site conditions.

MethodPublished accuracyUsed forWatch out for
Robotic total stationHi-Target HTS-820Angle 2″ · 2 mm + 2 ppm with prism · 3 mm + 2 ppm reflectorlessPlot as-builts: corners, setbacks, heights, column checksPoint-by-point; slower for full interiors
Handheld SLAM LiDARGeoSLAM SLAM2000< 1 cm relative (post-processed) · < 5 cm absolute · 200,000 points/sBuilding as-builts: interiors, MEP, facades, occupied buildingsTied to total station control for coordinates
RTK + SLAM receiverHi-Target V700SRTK 8 mm + 1 ppm (H) with built-in laser scanningLarge sites: external works and building outlines in one passRTK needs open sky; switches to laser positioning under cover
RTK GNSSHi-Target iRTK58 mm + 1 ppm horizontal · 15 mm + 1 ppm vertical (RMS)Control and external works on open plotsNot used for interiors or close to tall facades

ppm = parts per million of the measured distance. RMS figures as published on Hi-Target and GeoSLAM specification sheets.

As-builts that match how Dubai checks them.

Completion rules depend on the authority, and some as-built work in Dubai is regulated. We settle both before any measurement is taken.

01

Completion submissions

Dubai Municipality, DDA and Trakhees each set their own completion requirements. In DDA areas, a Third Party Building Survey by a DLD-registered surveyor is mandatory before the completion certificate, except for villas. We confirm what your project needs before we start.

DDA third party building survey ↗
02

DLTM coordinates

Plot as-builts are surveyed on the Dubai Local Transverse Mercator grid (EPSG:3997), so setbacks and footprint coordinates compare directly with your affection plan and approved site plan.

Dubai Municipality geodesy ↗
03

Measured vs title areas

Our measured areas are for design, leasing plans and facility management. Official real-estate area and title surveys are regulated by Dubai Land Department and carried out by DLD-accredited survey companies.

DLD accredited survey companies ↗

From approved drawings to as-built in five steps.

1

Scope

Send approved drawings, plot number and purpose. We agree as-built type, detail, tolerance and files.

2

Control

Control points are fixed with a total station, tied to DLTM for plot as-builts.

3

Capture

Total station and RTK outside; handheld LiDAR through every floor, plant room and riser.

4

Drafting & comparison

Plans, sections and elevations are drafted from the scan and compared with the approved design.

5

QA & delivery

Drawings are checked against the point cloud, then DWG, PDF, RVT, E57 and the deviation report are issued.

As-built files your team can use today.

Layers, title block, drawing list and tolerance are agreed before fieldwork. Revit and point-cloud files are available from the same survey.

.DWG
As-built drawings
Floor plans, sections, elevations and site plan
PDF
Drawing sheets
Print-ready sets for review and submission
Report
Deviation report
Built versus approved, with marked-up drawings
.RVT / .IFC
BIM model
Revit model of the building as it stands
.E57 / .LAS
Point cloud
Full scan data for future checks and design
.CSV
Coordinate list
Footprint corners, levels and control points

As-built surveys for builders, designers and owners.

Contractors

Completion and handover as-builts that match the work on site

Consultants & architects

Measured existing conditions for redesign and submissions

Developers

Record sets for handover, sales and owner associations

Fit-out & interior designers

Shell-and-core plans, ceiling levels and visible MEP

Facility managers

Up-to-date plans and BIM for maintenance and space planning

Owners & buyers

Accurate floor plans of villas, apartments and offices

Where we carry out as-built surveys

Business BayDowntown DubaiDubai MarinaJLTDIFCDubai Hills EstateAl BarshaAl QuozJebel AliDubai Silicon OasisDubai SouthDeiraAbu DhabiSharjahAjman

As-built drawings in Dubai: your questions.

As-built drawings record a building or plot exactly as it was constructed, including every change made during construction. They show the real positions of walls, columns, openings, levels and services, and are used for completion submissions, handover, renovation, fit-out and facility management.
The as-built survey is the measurement work on site — total station, GNSS and laser scanning. The as-built drawings are what we produce from those measurements: floor plans, sections, elevations, a site plan and, if needed, a Revit model. Drawings without a survey are only an updated design, not a true as-built.
Completion submissions to Dubai Municipality, DDA or Trakhees normally include as-built drawings that show the final construction. In DDA areas, a Third Party Building Survey by a surveyor registered with Dubai Land Department is mandatory before the completion certificate, except for villas. Your consultant or the authority confirms the exact requirements for your project.
A plot as-built survey covers the building footprint, setbacks, height, floor and external levels, and external works. A building as-built survey covers floor plans, sections, elevations, the structural grid, visible MEP services and ceiling levels. We agree the scope, tolerance and file list before fieldwork.
Shop drawings are prepared before installation to show how something will be fabricated and fixed. Record drawings are often the contractor's marked-up design set. As-built drawings produced from a survey show what was actually measured on site, which makes them the most reliable of the three.
Our handheld SLAM LiDAR is specified to under 1 cm relative accuracy after processing, and our robotic total station measures distances to 2 mm + 2 ppm with a prism. We use the total station for control and critical points such as setbacks and column positions, and the scanner for full interior detail.
As-built drawing cost in Dubai depends on floor area, number of floors, building type, whether MEP is included, the deliverables (CAD, Revit or both) and any authority format. A villa as-built costs far less than a multi-storey commercial building. Sicher 3D gives a clear, fixed quote after reviewing your drawings and scope.
Scanning a typical villa or office floor is usually completed in a single site visit. Larger buildings are scanned floor by floor and may be phased around access. Drawing delivery time depends on the scope and is confirmed in writing with your quote.
Yes. Handheld laser scanning moves through spaces quickly and does not need the building to be empty. We agree access times, areas and any security requirements with the building management before we start.
Yes. The same point cloud used for the as-built drawings can be modelled in Revit by our in-house BIM team, at the level of detail you specify. Many clients order CAD drawings now and add a Revit model later without another site visit.
Yes. We scan the building, overlay the scan on your existing drawings and update only what differs. You keep your layers and title block, and every change is backed by a measurement.

Send your approved drawings. Get the real ones back.

Share your approved drawings, plot number and what the as-built is for. A surveyor will confirm the scope, tolerance, authority requirements and a clear, fixed quote.

VisitPark Lane Tower, Office 708, Business Bay, Dubai
Send a Message

Start Your As-Built Survey

Tell us about the building and what the as-built is for — completion, handover, renovation, fit-out or FM. We'll respond with a clear, fixed quote within 24 hours.

Project Enquiry
All fields marked with * are required.
Please enter your name.
Please enter your phone number.
Please enter a valid email.

Prefer to talk? Call +971 50 108 0764 or WhatsApp us.