Setting Out Survey Services in Dubai.

Sicher 3D's setting out surveyors transfer your approved design onto site in Dubai — plot points, piles, grid lines, columns, footings and road alignments — using robotic total stations and RTK GNSS. Every critical point is checked before concrete is poured.

✓Control points and temporary benchmarks on site
✓Plot points, piles, footings and pile caps
✓Grid lines and columns transferred floor by floor
✓Roads, kerbs, drainage and external works
✓Independent check of every critical point
2″
Total station angle
2mm
Prism distance + 2 ppm
180°/s
Robotic turning speed
15+
Years in the UAE

What is a setting out survey, and why check it twice?

A setting out survey is the reverse of a topographic survey. Instead of measuring what is on the ground and drawing it, the surveyor takes coordinates from the approved drawings and marks them on the ground — so the building is built in the right place, at the right level.

A column 30 mm out of position can mean broken-out concrete, redesigned beams and lost weeks. Most of those errors start with a wrong coordinate on the drawing, a disturbed control point or a peg lost during excavation — all of which a proper setting-out process is designed to catch.

This page explains what we set out at each stage of construction, the method behind each point, how we check our own work, and what your site team receives.

From the first peg to the last kerb.

Setting out runs through the whole build. These are the points our surveyors mark for contractors in Dubai — each one tied to the same control network.

Sicher 3D Advantage

Set out, then checked — before the concrete truck arrives.

A setting-out error is cheap on day one and very expensive after the pour. Every critical point we mark is measured a second time from independent control, and the difference is written into the check report. Your site engineer gets a coordinate schedule, a marked-up drawing and proof that the point in the ground is the point on the drawing.

Robotic total stationIndependent controlCheck reportOffset pegs
Start

Control & Benchmarks

Control stations and temporary benchmarks fixed and protected on site, tied to the project grid and DLTM.

Plot

Plot Points & Building Outline

Plot corners checked against the affection plan, then the building outline and excavation limits marked.

Foundations

Piles, Pile Caps & Footings

Pile centres with offset pegs, then pile caps, footings and raft edges once piling is complete.

Structure

Grid Lines & Columns

Grid lines transferred to every slab, with column, core-wall and shear-wall positions marked floor by floor.

Fit-out

Walls, Openings & Levels

Blockwork lines, door and window openings, lift and stair cores, and finished-level marks.

External works

Roads, Kerbs & Drainage

Road centrelines, kerb lines, manholes, gullies and falls for car parks, access roads and infrastructure.

Steel & MEP

Anchor Bolts & Embedments

Anchor-bolt groups, base plates, sleeves and embedded items positioned before concrete is poured.

Marked from one control point. Checked from another.

For a pile layout, the total station sits on known control outside the work area and marks each pile centre. Offset pegs keep the positions recoverable once the piling rig arrives. The critical points are then re-measured from a second control point, and the differences go into the check report.

  • 01Control points outside the work area
  • 02Design coordinates checked before marking
  • 03Pile centres marked from the total station
  • 04Offset pegs so points survive excavation
  • 05Each point re-measured from second control
  • 06Deviation recorded in the check report
ABCD123CP-01 · TSCP-02check from CP-02P01P02P03P04P05P06P07P08P09P10P11P12offset 2.0 mCHECK REPORT · TOL ±10 mmP01ΔE +3ΔN −2✓P02ΔE −4ΔN +1✓P05ΔE +2ΔN +5✓P07setting out…
△ Control point◌ Design pile centre✕ Set out & checked■ Offset peg◉ Being set out
Illustrative example — not a real survey

One visit, a full programme or an independent check.

Choose the arrangement that matches your project. Every option includes control, setting out or checking, and a written report.

One-off

Single Visit

For a defined set of points on one day.

  • ✓Plot points or building outline
  • ✓Pile or footing layout
  • ✓Coordinate schedule and report
  • ✓Check of every point set out
Get a quote →
Most projects

Phased Programme

Visits booked against your construction programme.

  • ✓Control and benchmarks at mobilisation
  • ✓Piling, foundations and each slab
  • ✓External works and drainage
  • ✓One surveyor team and one control network throughout
Plan my setting out →
For consultants & developers

Independent Check Survey

Verification of the contractor's own setting out.

  • ✓Re-measurement of critical points
  • ✓Comparison with design coordinates
  • ✓Deviation schedule with tolerances
  • ✓Clear report for the site supervisor
Get a quote →

Setting out through the whole build.

Each construction stage needs different points — and a different check before the next trade moves in.

StageWhat we set outWhat we check
MobilisationControl stations, temporary benchmarks, plot corners checked against the affection planControl network closure and benchmark levels
PilingPile centres with offset pegs; piling platform levelsPile positions re-measured after installation
FoundationsPile caps, footings, raft edges, grid lines and excavation levelsFormwork positions and levels before pour
SuperstructureGrid lines and columns transferred to each slab; core and shear wallsColumn positions and slab levels per floor
Blockwork & fit-outWall lines, openings, finished-level marksRoom dimensions and opening positions
External worksRoads, kerbs, manholes, drainage falls, landscaping levelsLevels and falls before surfacing
HandoverFinal control stations and benchmarks handed over to the clientFinished building recorded by an as-built survey

Planning a phased programme?Send your drawings and construction programme — we will map the visits to your milestones.

WhatsApp your programme →

The right instrument for every tolerance.

Structural points need a total station. Roads and earthworks can be set out faster with RTK. We match the method to the tolerance in your specification. Figures below are published manufacturer specifications.

MethodPublished specificationUsed forNot used for
Robotic total stationHi-Target HTS-820Angle 2″ (1″ optional) · 2 mm + 2 ppm with prism · ≥180°/s turning · ≤2″ positioningColumns, grid lines, anchor bolts, piles — anything structuralNeeds line of sight; control must be protected on busy sites
Total stationHi-Target HTS-720Angle 1″/2″ · 2 mm + 2 ppm with prism · 3 mm + 2 ppm reflectorlessBuilding setting out and reflectorless checks of hard-to-reach pointsManual pointing; two-person operation for long runs
RTK GNSSHi-Target iRTK58 mm + 1 ppm horizontal · 15 mm + 1 ppm vertical (RMS)Plot points, roads, earthworks and large open sitesNot used for structural points that need millimetre tolerance
Laser / AR RTKHi-Target V600LImage stake-out 2 cm within 10 m · non-contact points up to 2 cmFast layout of non-critical points: landscaping, temporary worksNot for structural or tight-tolerance setting out

ppm = parts per million of the measured distance. Figures as published on Hi-Target specification sheets; achieved accuracy also depends on control and site conditions.

The instruments behind every peg.

We set out with the same Hi-Target instruments we distribute across the UAE — and sell the MiniPro airbag that protects a total station on a busy site. Each one is available to buy from Sicher 3D.

Most setting-out errors start on paper.

Wrong coordinates, a rotated CAD grid or a disturbed benchmark cause more rework than instrument error. We check all three before anything is marked. The Dubai grid is published as EPSG:3997 (WGS 84 / Dubai Local TM).

01

Coordinates checked first

Design drawings are often drawn in local CAD coordinates. Before marking anything we check the drawing grid against the plot coordinates on the DLTM grid (EPSG:3997) and flag any shift or rotation to the design team.

Dubai Municipality geodesy ↗
02

Your tolerances, recorded

Setting-out tolerances come from your project specification. We choose the method to suit them and record the measured deviation of every checked point, so the site supervisor can sign off with evidence.

Recorded in every check report
03

Plot pegs vs official demarcation

We check existing plot pegs against your affection plan before setting out the building. Placing or reinstating official cadastral boundary pegs is a regulated service handled by authorised surveyors.

DLD accredited survey companies ↗

From drawing to peg in five steps.

1

Drawings check

We receive the for-construction drawings and verify grids and coordinates against the plot.

2

Control

Control stations and benchmarks are set, protected and tied to the project grid.

3

Setting out

Points are marked with pegs, nails or paint, with offset pegs where excavation follows.

4

Independent check

Critical points are re-measured from separate control and the deviations recorded.

5

Report & handover

Coordinate schedule, marked-up drawing and check report go to your site engineer.

Paperwork your site supervisor can sign off.

Every visit ends with records your site engineer, consultant and future surveyors can rely on.

Report
Setting-out report
What was marked, where, and from which control
.CSV / .XLS
Coordinate schedule
Point IDs, design and set-out coordinates, levels
Check
Check survey report
Measured deviation of every critical point
.DWG / PDF
Marked-up drawing
Points and offsets shown on your layout
Control
Control & TBM sheet
Stations, benchmarks and descriptions for the site team
.DWG
As-set-out positions
Pile and column positions as installed, for records

Setting out for every trade on site.

Main contractors

Control, building layout and floor-by-floor setting out

Piling contractors

Pile centres, offset pegs and post-piling position checks

Steel & precast erectors

Anchor bolts, base plates and embedment positions

Consultants & supervisors

Independent check surveys of contractor setting out

Developers

Phased setting-out programmes across villa and building plots

Infrastructure contractors

Roads, kerbs, drainage and utility alignments

Where we carry out setting out surveys

Dubai SouthJebel AliAl QuozDubai Investments ParkDubai Hills EstateMeydanAl FurjanJumeirah Village CircleBusiness BayDubai Silicon OasisAl KhawaneejNad Al ShebaAbu DhabiSharjahAjman

Setting out in Dubai: your questions.

A setting out survey transfers the positions on approved construction drawings onto the ground, so the building is built in the right place and at the right level. The surveyor marks points such as plot corners, piles, grid lines, columns, walls and road alignments with pegs, nails or paint.
A setting out surveyor checks the drawing coordinates, sets up control points and benchmarks, marks the design positions on site, adds offset pegs where excavation will disturb the marks, and then checks the critical points a second time before handing a report to the site engineer.
It depends on the method and the tolerance in your project specification. Structural points are set out with a robotic total station specified to 2 seconds of angle and 2 mm + 2 ppm in distance with a prism. RTK GNSS, specified to 8 mm + 1 ppm horizontally, is used for plot points, roads and earthworks where that tolerance is acceptable.
Approved for-construction drawings in CAD with coordinates, the affection plan, any existing control or benchmark information, and safe access to the area to be set out. We check the drawing coordinates against the plot before the visit and raise any discrepancy with your design team.
An offset peg is placed a fixed distance away from the actual point, outside the area that will be excavated or worked on. When the original mark is lost during digging or piling, the site team can re-establish it from the offset pegs without calling the surveyor back.
A check survey re-measures points that have already been set out, preferably from independent control, and records how far each one is from its design position. We include checks in our own setting out, and we also carry out independent check surveys of a contractor's work for consultants and developers.
Setting out cost in Dubai depends on the number of points, the stage of work, how many visits are needed, the tolerance required and site access. A one-off plot or pile layout costs less than a phased programme covering a whole building. Sicher 3D gives a clear, fixed quote after reviewing your drawings and programme.
Send your drawings and construction programme on WhatsApp or by email. For phased projects we book visits against your programme milestones, such as piling, each slab pour and external works, so the surveyor arrives when the site is ready.
Yes, once the relationship to the site is confirmed. We compare the drawing grid with the plot coordinates on the DLTM grid, resolve any shift or rotation with the design team, and set out from the agreed transformation.
We check existing plot pegs against the coordinates on your affection plan before setting out the building. Placing or reinstating official cadastral boundary pegs is a regulated service carried out by authorised surveyors; if your plot needs it, we will tell you at the scoping stage.

Send your drawings. We'll set it out right.

Share your for-construction drawings, affection plan and programme. A surveyor will check the coordinates, plan the visits and send a clear, fixed quote.

VisitPark Lane Tower, Office 708, Business Bay, Dubai
Send a Message

Book Your Setting Out Survey

Send your drawings and construction programme. We'll check the coordinates, plan the visits and reply with a clear, fixed quote within 24 hours.