Construction Survey Services in Dubai.
Sicher 3D provides construction surveying in Dubai from groundbreaking to handover: control networks, setting out, level checks, earthworks volumes, progress scans and slab flatness — all from one survey team on one control network.
What does a construction survey cover?
A construction survey is the survey work that keeps a project in the right place, at the right level and in the right quantities — from the first control point to the final as-built. It is not one visit but a sequence of surveys, each tied to the same reference.
On a Dubai site that usually means control at mobilisation, setting out and checks for every pour, volumes for earthworks, scans to prove progress and quality, and an as-built record at the end. When each of those is done by a different surveyor on a different control, the numbers stop agreeing — and disputes start.
This page explains every construction survey we carry out, how we check concrete and quantities, the methods behind them and what your site team, QS and consultant receive.
Every survey a construction site needs, on one reference.
Pick a single service or the full programme. Either way, every survey ties back to the same control network and the same team.
One control network and one survey team — from groundbreaking to handover.
Construction surveys go wrong when every stage uses a different surveyor and a slightly different control. We set up one protected control network at mobilisation and use it for every survey that follows: setting out, levels, volumes, progress scans, flatness checks and the final as-built. Every number your site team, QS and consultant see comes from the same reference.
Control Networks & Benchmarks
Static GNSS and total station control, tied to DLTM, with temporary benchmarks protected and re-checked through the build.
Setting Out
Piles, grids, columns, walls, roads and anchor bolts — set out from our control and checked before work continues.
Setting Out page →Level & Formwork Checks
Formwork positions, slab levels, column positions and verticality checked before concrete is poured.
Cut, Fill & Stockpile Volumes
Surface models before and after earthworks, with cut-and-fill and stockpile quantities your QS can audit.
Progress Surveys & Scans
Scheduled point-cloud scans and measured quantities to support progress reports and interim valuations.
Slab Flatness & Deviation
Deviation heatmaps of slabs, walls and columns against design, with FF/FL values where your specification sets them.
As-Built Survey
A measured record of the finished building and external works at handover.
As-Built Survey page →See the whole slab, not ten spot levels.
A laser scan captures millions of points across a slab, wall or column. We compare them with the design level or model and produce a colour deviation map, so high spots, low spots and out-of-tolerance areas are obvious before finishes go down — and can be re-checked after remedial work.
- 01High and low spots against design level
- 02Areas outside tolerance, ready for grinding or levelling
- 03Slab edges, steps and drops
- 04Before-and-after checks of remedial work
- 05Column and wall deviation from design
- 06FF/FL values where the specification requires them
Volumes, quality checks and progress you can prove.
Three services contractors in Dubai ask for most — available on their own or as part of a full survey programme.
Volumes & Quantities
For enabling works, excavation, backfill and stockpiles.
- ✓Original ground surface before work starts
- ✓Cut-and-fill against design or previous survey
- ✓Stockpile volumes with RTK and SLAM scanning
- ✓Volume report and surface DWG for the QS
Structural & Slab Checks
For contractors and consultants who need proof before the next pour.
- ✓Formwork, level and column checks
- ✓Slab deviation heatmaps from laser scan
- ✓FF/FL values where specified
- ✓Check report with tolerances and pass/fail
Progress Scanning
For PMs, QS and developers tracking what has been built.
- ✓Scheduled scans at agreed milestones
- ✓Point clouds compared with design or BIM
- ✓Measured quantities for valuations
- ✓A dated record of the site at each visit
Construction surveying through the whole project.
What we survey at each stage, and what your team receives.
| Stage | What we survey | What you receive |
|---|---|---|
| Pre-construction | Topographic survey, existing structures, control network | Topographic survey on the DLTM grid |
| Enabling & earthworks | Original ground, excavation levels, cut and fill, stockpiles | Volume reports and surface models |
| Piling & foundations | Pile setting out, pile positions after installation, foundation levels | Setting out and check reports |
| Structure | Grid and column transfer, slab levels, formwork and verticality checks | Check reports and slab deviation heatmaps |
| MEP & fit-out | Scans of installed structure and services for coordination | Point clouds for BIM coordination |
| External works | Roads, kerbs, drainage falls, landscaping levels | Level checks before surfacing |
| Handover | Measured record of the finished building and site | As-built survey and drawings |
Planning surveys for a new project?Send your drawings and programme — we will map surveys to your milestones.
WhatsApp your programme →Matched to the tolerance, not to habit.
Earthworks quantities and structural checks need very different accuracy. We pick the method for each task. Figures below are published manufacturer specifications; achieved accuracy also depends on control and site conditions.
| Method | Published specification | Used for | Watch out for |
|---|---|---|---|
| Robotic total stationHi-Target HTS-820 | Angle 2″ · 2 mm + 2 ppm with prism · 3 mm + 2 ppm reflectorless | Control, levels, column checks, strict floor-flatness grids | Point by point; slower for full-surface capture |
| RTK GNSSHi-Target iRTK5 | 8 mm + 1 ppm horizontal · 15 mm + 1 ppm vertical (RMS) | Earthworks surfaces, roads, open stockpiles | Not for structural tolerances or inside buildings |
| RTK + SLAMHi-Target V700S | RTK 8 mm + 1 ppm (H) · laser positioning where GNSS drops out | Fast earthworks and stockpile surfaces in one pass | Absolute accuracy depends on GNSS conditions |
| Handheld SLAM LiDARGeoSLAM SLAM2000 | < 1 cm relative (post-processed) · < 5 cm absolute · 200,000 points/s | Progress scans, slab and wall deviation heatmaps, structure | Strict FF/FL specifications may call for a total-station grid instead |
ppm = parts per million of the measured distance. RMS figures as published on Hi-Target and GeoSLAM specification sheets.
The instruments behind every check.
We survey with the same Hi-Target, FJD and GeoSLAM instruments we distribute across the UAE — plus the MiniPro airbag that protects a total station on a busy site. Each one is available to buy from Sicher 3D.
Surveys that still agree at handover.
On a long project the risk is not one bad measurement — it is slow drift between surveys. Three rules prevent it. The Dubai grid is published as EPSG:3997 (WGS 84 / Dubai Local TM).
One control network
Control is established on the DLTM grid (EPSG:3997) at mobilisation, protected on site and re-checked at intervals, so a level measured in month one still agrees with a level measured at handover.
Dubai Municipality geodesy ↗Quantities you can audit
Every volume report states the surfaces compared, the survey dates, the method and the boundary used. Your QS or the client's consultant can check exactly how each number was produced.
Stated in every reportTolerances from your spec
Level, position and flatness tolerances come from your project specification, including FF/FL numbers under ASTM E1155 where specified. We choose the method to suit them and report each result against the tolerance.
ASTM E1155 · FF/FL ↗A construction survey programme in five steps.
Kick-off
We review drawings, specification and programme, then agree survey milestones and tolerances.
Control network
Control stations and benchmarks are established on DLTM and protected on site.
Milestone surveys
Setting out, levels, volumes, scans and checks are carried out as each stage is ready.
Compare & report
Results are compared with design, tolerances or the previous survey and reported quickly.
Records & handover
Dated reports, surfaces, point clouds and the final as-built form the project record.
Reports your site, QS and consultant can use.
Every visit produces a dated record. Together they form a measured history of the project.
Construction surveying for the whole project team.
Main contractors
Control, checks and records from mobilisation to handover
Earthworks & infrastructure contractors
Surfaces, volumes and level control
Quantity surveyors
Measured quantities and progress records for valuations
PM & supervision consultants
Independent checks and dated site records
Developers
One survey partner across design, construction and handover
Concrete & flooring contractors
Slab flatness and deviation before and after finishing
Where we carry out construction surveys
Construction surveying in Dubai: your questions.
What is construction surveying?
+How is a construction survey different from a setting out survey?
+Which surveys does a construction project in Dubai need?
+How are cut and fill volumes calculated?
+Can you measure stockpile volumes?
+What are FF and FL floor flatness numbers?
+Can laser scanning check concrete slabs and columns?
+Can you provide regular progress surveys for interim valuations?
+How much does construction surveying cost in Dubai?
+Do construction surveys need to be submitted to an authority?
+Send your programme. We'll plan every survey.
Share your drawings, specification and construction programme. A surveyor will propose the survey milestones, methods and tolerances, with a clear, fixed quote.
Plan Your Construction Surveys
Share your project, specification and programme. We'll propose the survey milestones, methods and tolerances, with a clear, fixed quote within 24 hours.